Hi,
I have a host with (2) socket, (10) cores per 2.2GHz socket with the following types of VMs: Web Application and SQL Server Always On.
I'm going to buy a new equipment and I'm in doubt below:
- (Option 1): Should I acquire a new host with (2) socket, (20) cores per 2.1 GHz socket
or
- (Option 2): I must acquire a new host with (2) socket, (8) cores per 3.2 GHz socket.
OBS 1: If I decide to use (Option 1), I will have a total of more cores, but a lower GHz capacity and I will also need to acquire more SQL licenses.
OBS 2: If I decide to use (Option 2), I have a smaller total of cores, but a greater GHz capacity and I will not need to change my SQL licensing.
Doubt:
1 - What should I consider regarding the decision? The amount of cores per socket to increase my number of processes (thread) or just the amount of GHz?
Thanks.