Hi SRM Experts,
We have old vSphere 6 and SRM 6.x environments, with a protection group replicated from Site A to Site B.
As a part of Tech Refresh, we have separately setup vSphere 8 environment (in Site A and site B) and have also just installed SRM 8.8. Array based replication is yet to be configured.
The plan is to migrate the current SRM 6.1 protection group which consists of several file server VMs, to Site B (which will be the new Primary Site) and then configure the SRM replication from Site B to Site A.
Could anyone please suggest how this can be achieved with minimum or no downtime for the fileservers?
Thanks in advance.