Hey I have a problem and I cannot find a solution.
Even though the Host utilization of 2 of my 7 hosts is around 30 % , DPM does not consilidate the VMs of these hosts and power one down.
I have already disabled HA ,power-off Cost benefit and DRS cost benefit evaluation. The DRS and DPM threshold is set to 5 and both are in automatic mode.
I do not have set any Affinity or Reservation rules, so there is no reason why both hosts are kept alive. I have been waiting for 12 Hours now.
What is really suprising is that when I manually migrate both vms onto one Hosts, I get the Power Off reccomendation a few minutes after it. I also get a Power off Migration if I reduce the host utilization on both hosts to 20 %. But in my Opinion 30 % should be enough to power down one host, as the utilization range is set to 45-81 percent. I have attached pictures regarding cpu and ram utilization
Does anyone have an answer what might cause the problem?