Hi All,
We put in a 2 node direct connect VSAN a while back.
Each of the 2 nodes has a single 12 core processor
We are now getting close to consuming 50% CPU/RAM. We need to increase both CPU and RAM. Increasing RAM is easy enough but increasing CPU might not be. I understand we can add a 3rd node but this requires purchasing storage switches and moving away from direct connect. I would appreciate the community opinion on these alternate options.
Option 1
Is it possible to change the processor from a 12 core to a 24 core processor on each of the VSAN nodes?
This would consist of evacuating VMs from 1 node, shutting down the node, swapping the processor.
Is this a supported option?
Option 2
Adding a second CPU to each VSAN node.
This would consist of purchasing a CPU and 2x VSAN licenses.
Thanks