We have a situation where our Iteration status shows a value of TO DO hours of 48.5 and our Team status shows the TO DO hours of 50.5. Shouldn't these be exact?
As I dug into this I also noticed that I have two user stories with a total that does not equal the sum of the tasks.
How can this be? (We are an On Prem solution user)
thank you
Donna