Hi,
As we are planning for ca servicedesk upgrade to 12.9.If we consider the hardware configuration as 1 background server,1 standaby server,2 Application servers,1 database server,1 reporting server for production setup.
Then for DR setup will we require same number of servers or less.
what will be the number of servers required.
Thanks