Hi,
This is an architectural transition.
Because Operations 9.x transitions from the legacy Aria Suite Lifecycle Manager (vRSLCM) lifecycle model to the VCF 9 architecture. Therefore, the supported upgrade procedure requires manual snapshots and an upgrade through the Operations Admin UI, followed by removing Operations from vRSLCM management. Using vRSLCM for this upgrade would follow the legacy lifecycle workflow rather than the Broadcom documented procedure.
Thanks