Hi there, we are planning to move 1100 VMs from one AVS instance to another over an AVS Interconnect using Bulk Migration. The documentation states there is a limit of 1000 concurrent sessions with an extended HCX manager.
In this context, does concurrency mean those that have completed the pre-stage AND those in delta catchup mode (meaning I cannot do all 1100), or does it only relate to the pre-stage VMs and I can split this into two "batches" and complete all 1100 in the same maintenance window.
Thanks