Upgrade order for SAN switches - Director first or Edge switches?

We are planning of upgrade of our Brocade SAN fabric and want to know if we need to upgrade the 4/256 Director first, or the 9 Edge switches first. The edge switches are 4/16s, 2/32, and HP Blade Brocade SAN switches.

What is the best practice for this?

Thanks,

Patti