CA Workload Automation CA 7 Edition

Expand all | Collapse all

JOBB dependant on multiple runs of JOBA

Jump to Best Answer
  • 1.  JOBB dependant on multiple runs of JOBA

    Posted 06-11-2019 03:33 PM
    I have JOBA that runs twice per day on the same schid.  The runs can be anywhere from 1 minute to 2 hours apart.  JOBB needs to run after both runs of JOBA have completed.  Any ideas on how to accomplish this?


  • 2.  RE: JOBB dependant on multiple runs of JOBA
    Best Answer

    Posted 06-13-2019 10:28 AM
    From a direct CA 7 perspective, I can not think of a way to achieve this outside of time scheduling. Meaning, schedule JOBB outside the time range of the 2 runs of JOBA. I am sure you already thought of that and that probably will not work because JOBA runs can occur at anytime.

    The only other thing I can think of off hand is to have your automation tools (OPS/MVS) detect 2 runs of JOBA and then logon to CA 7 and demand JOBB.



  • 3.  RE: JOBB dependant on multiple runs of JOBA

    Posted 06-14-2019 12:02 PM
    Thanks Roderick