From a direct CA 7 perspective, I can not think of a way to achieve this outside of time scheduling. Meaning, schedule JOBB outside the time range of the 2 runs of JOBA. I am sure you already thought of that and that probably will not work because JOBA runs can occur at anytime.
The only other thing I can think of off hand is to have your automation tools (OPS/MVS) detect 2 runs of JOBA and then logon to CA 7 and demand JOBB.
Original Message:
Sent: 06-11-2019 03:29 PM
From: Don Deckard
Subject: JOBB dependant on multiple runs of JOBA
I have JOBA that runs twice per day on the same schid. The runs can be anywhere from 1 minute to 2 hours apart. JOBB needs to run after both runs of JOBA have completed. Any ideas on how to accomplish this?