I wonder if a calendar expert can help me.
I have a WA standard calendar which is populated with a date for every week in each month, so potentially there could be four or five dates per month.
I would like to use that standard calendar and create an extended calendar with a condition to select the last entry in the standard calendar and add 1 to populate the extended calendar.
Having read the "Managing Calendars" section of the manual, I could not see a condition I could use to select the last date from a calendar.
Is it possible to create an extended calendar with above condition or is this one situation when it not possible?
Would it be easier to setup condition(s) if there were exactly four dates per month?
Thank you
Lee