We have a user who manages a "hub" project plan in Open Workbench who has hit a limit of 1000 External Dependencies. We have a hosted 14.3 instance of CA PPM and OWB 2.1.2. Is there anything that can be done by the user or in the application configuration, though I believe this is probably a server side setting.
We have raised a ticket with CA Support, but just wanted to see if anyone else has hit this problem and what they did / could do about it.
Thanks!