In this example, the external dependency is set to only run on the 4th of July.
1. Always set the
expected status to
ANY_OK in the
'External dependency' tab rather than in the task's dependencies tab.
Note: ANY_OK covers the following statuses = Ended inactive, Ended skip because of calendar, Ended OK
https://us.v-cdn.net/5019921/uploads/editor/tc/dfenfgdu6ybg.jpg" width="872">
2. This external dependency will only run on the 4th of July. Any other day, it will be skipped:
https://us.v-cdn.net/5019921/uploads/editor/a7/fafbunzd6grw.jpg" width="566">
3. Leave the status blank in the task's
'Dependencies' tab.
https://us.v-cdn.net/5019921/uploads/editor/9j/yhi2g79a26sw.jpg" width="775">