Is there a way to assign ETC at an individual assignment level in the new UX? The only place I can find to set ETC is on the detail page and that divides the ETC up between everyone assigned to the task.
Hi Neil,
At this time the underlying assignment level activity is not available in the New UX. It is planned though.